Graham Construction selected ABI Equipment Ltd to provide a specially prepared telescopic leader rig for the initial installation of onshore steel tubular piles for a new jetty construction at Grimsby Docks in May 2012. The project involved the installation of 35m long Ø762 steel tubes at the foreshore location, with potentially unstable soil conditions. Jetty Construction, Grimsby Docks Contractor: Graham Construction Ltd Technique: Driven Piling Equipment: ABI Mobilram TM 16/20 B ABI MRZV30V The proposed solution from ABI Equipment Ltd was to bring three key elements together: Firstly, a highly stable piling rig in the form of an ABI TM6/20B Mobilram - a 65-tonne purpose built machine with 'B'-version kinematic