Case Study

Goose Creek Bridge Replacement

Goose Creek Bridge Replacement

Pages 1 Pages

An Employee-Owned Company | © 2014 Kleinfelder. All rights reserved. The Texas Department of Transportation (TxDOT) was planning to replace a deteriorated bridge on State Highway 146 across Goose Creek in Baytown, Texas. During geotechnical borings, hydrocarbon odors were noted in the subsurface soil and in sediment within the creek. Kleinfelder conducted soil and sediment sampling to assess concentrations of hydrocarbons. SCHEDULING CONST

Join for free to read