Case Study

Goodna Substation

Goodna Substation

Pages 1 Pages

Project: Goodna Substation Date: July 2013 Client: Powerlink Contractor: L & K Truck & Bobcat Hire Location: Goodna, QLD SmartDitch ® System The Problem: An earth drainage ditch beside an access road to the substation was eroding and transporting silt, allowing it to accumulate in an access grate and storm water pipes, blocking water flow. Upon in- spection, the grate was covered with over 200mm of silt and the underly- ing drainage

Join for free to read