Case Study
Gold Beach, OR
Project Name Gold Beach, Oregon Community System System Specifications New WWTP with innovative 2.0 MGD chamber drainfield design Infiltrator Products Used Infiltrator Quick4™ Equalizer 24 Chambers Installation Date Spring 2012 Engineer Aaron Speakman The Dyer Partnership Engineers Owner