Head Office Braintree London•Birmingham•Edinburgh•Daventry•Dublin Apr-09 The Main Contractor designed a tight schedule to allow the last game in 06/07 season to be played and guarantee a working stadium by November 2007. Converge Networks had to ensure delivery on time. 253 Enhanced Category 5 outlets and a wireless network were installed throughout the 114m long stadium at Kingsholm. Converge also installed the AV and PA sy