Case Study

German megawatt system with above-average insolation values

German megawatt system with above-average insolation values

/ Perfect Welding / Solar Energy / Perfect Charging EN v01 Nov 2014 © Sonnenzeit GmbH © Sonnenzeit GmbH © Sonnenzeit GmbH SOLAR POWER PLANT NEAR ROSTOCK, GERMANY / The 1.5 MW field installation south of the A20 motorway in northern Germa- ny was connected to the grid in January 2014. Fourteen Fronius Agilo 100.0-3 inverters provide an annual yield of 1,380 megawatt hours at the 10,200 m² photovoltaic power plant with 6,195 solar modules. “With

Join for free to read