Case Study

Geotube® Containers capture precipitated metals at this Gold Mine

Geotube® Containers capture precipitated metals at this Gold Mine

Pages 1 Pages

May, 2015 Volume 344 Your Water, Wastewater, & Materials Dewatering Partner 5031 68th Street SE, Caledonia, MI 49316 | (616) 575-8693 | Fax: (616) 575-9031 Geotube® Containers capture precipitated metals at this Gold Mine The Challenge The objective was to divert the mining runoff water to the treatment plant where caustic was added to raise the pH to 8. This would precipitate the metals. These metals needed to be collected and dewatere

Join for free to read