Geotechnical Consultant - Greestone Place, University of Lincoln

Geotechnical Consultant - Greestone Place, University of Lincoln

Geotechnical Consultant - Greestone Place, University of Lincoln Purpose Delta-Simons was appointed by Ward Cole on behalf of the University of Lincoln to complete a ground investigation as part of a Phase II geo- environmental assessment on a section of land situated within the historic area of Uphill Lincoln. However, due to the location of the site within a historic area of the city, considerable care and planning was needed in order to select, operate and move the appropriate machinery into position, therefore allowing the proposed works of drilling multiple 25 metre boreholes to begin. Outline / Scope of WorksThe site at Greestone Place o?ered a unique issue that needed to be overcome before work could commence. As the only accessibly route into the site was through a 1 metre wide gat