Case Study
GeoFORM System Provided Option to Produce a Well Previously Shut In While Waiting for Injector Permit
GeoFORM System Provided Option to Produce a Well Previously Shut In While Waiting for Injector Permit
Benefits ? Reduced rig operating time – 24 hours compared to conventional gravel pack operations ? Saved pumping time ? Reduced HSE exposure, in man hours, equipment handling, and reduction in environmental footprint ? Provided easy retrieval Well background and challenges ? US Offshore ? 50 Cp heavy oil ? 8.4 ppg KCl completion fluid ? To be completed as a water injector ? Waiting period for permit ? Desired to produce in interi