Generic Drum Unit Simulator Boosts Productivity at South African Power Plant

Generic Drum Unit Simulator Boosts Productivity at South African Power Plant

Pages 2 Pages

Generic Drum Unit Simulator Boosts Productivity at South African Power Plant CUSTOMER CASE STUDY Goal y Install simulation system to help boost safety, efficiency and profitability at the plant Challenge y Improve productivity and plant operations, while increasing operator plant understanding, safety and reducing operating costs AVEVA Solution y DYNSIM Dynamic Simulation Results y The simulation system has reduced operating costs, while plant understanding and personnel safety have improved y Assists in providing continuous electricity to 95% of South Africa (around 60% of the total electricity consumed on the African continent) Eskom Lethabo www.eskom.co.za INDUSTRY PowerCUSTOMER CASE STUDY ESKOM LETHABO aveva.com About AVEVA AVEVA is a global leader in engineering and i