Case Study
Geelong Kw Solar Generation System
THE BENEFITS • Reduced peak load energy demand • R e d u c e d c a r b o n emissions • Reduced energy costs • Maintained & monitored by NuGreen Solutions • Long term warranty • Generation guarantee T AC GEELONG KW SOLAR GENERATION SYSTEM PROJECT COMMENCED JANUARY Solar Generation Systems are being adopted by more organisations as a way to reduce their carbon emissions with a positive financial outcome. NuGreen Solutions was engaged by JLL, Impact Investment Group and the TAC to install an additional 40kW of Solar PV, in Geelong, on their sustainable office. The intelligent design, from NuGreen Solutions, was chosen due to the DC optimised panels to ensure maximum output from the roof space available. Energy Efficiency Solutions TEL FAX