Case Study

Gatwick Airport – South Terminal Is Now Far Greener

Gatwick Airport – South Terminal Is Now Far Greener

Pages 2 Pages

CASE STUDY: GATWICK AIRPORT Gatwick Airport – South Terminal is now far greener. AT A GLANCE... PROJECT / CUSTOMER Gatwick Airport (South Terminal) DATE OF INSTALL Dec 2012 ANNUAL CONSUMPTION 1,633,313 (1) kWhr & 1,963,771 (2) kWhr IVOLT UNIT SIZE 2 X IVO3x800-12-2 ENERGY SAVING 8.95% (1) & 9.46% (2) CO2 EMISSIONS REDUCTION 65.1 (1) & 82.8 (2) metric tonnes The iVolt® was designed in the UK and production takes place at its facili

Join for free to read