Case Study
Gas Pipeline from Russia to Germany
case study From 1997 until 1999, 1,800 km pipeline was installed to transport gas from Russia through Belarus, Poland to Germany and Western Europe to secure gas supply for the next 30 years. The The background The 1,800 km pipeline consisted of 56” modified X65 carbon steel pipes. 100,000 pipes needed to be coated, with a surface of 8 million m 2 . The three layer coating system from Borealis met the stringent requirements for this proje