Confirmation of diagnosis Gas Compressor Crosshead Pin / Bush Clearance Concern Summary - This document consists of the detection and verification of a failure in the area of stems and crossbars of a JGK4 gas compressor with 3000 hours of operation. A PV measurement was performed with Windrock hardware equipment, the results were analyzed by detecting a stroke at the moment when there was no load, consequently the dimensional control of cylinders, pistons, rods, connecting rods and crosspieces corresponding to the compressor was verified, verifying the damage diagnosed. I. INTRODUCTION The machine condition analysis is based on vibration and ultrasonic measurements taken with the WINDROCK 6320 PA equipment. The data obtained from the engine crankshaft analysis were p