For more information: www.assetweb.com POWER Gainesville Regional Utility Improves Productivity with AMS TM Suite : Intelligent Device Manager RESULTS •50% reduction in time spent troubleshooting suspected valve problems •600 hours per year reduction in configuration, calibration, testing, device replacement, and valve diagnostics •Efficient instrument maintenance with limited manpower APPLICATION An existing 48 MW steam unit was repowered by converting it to a combined cycle facility using a General Electric gas turbine and an ATS heat recovery steam generator to drive the existing steam turbine. CUSTOMER The Gainesville Regional Utility serves the central Florida region including the growing Gainesville community, home of the University of Florida. CHALLENGE During the latter