Case Study

Future Testing Infrastructure

Future Testing Infrastructure

Pages 1 Pages

Construction Value: Confidential Project Overview: ACS designed and built three new heavy-duty diesel engine transient emissions test cells for the development of over-the-road truck engines for 2007 and 2010 certification. Part of the turnkey delivery of this project was the integrated data acquisition and control system that included a PLC designed, built and programmed by ACS. Key Performance Features: • ACS provided final electrical

Join for free to read