Case Study

Future-Proof Network For Heinen & Hopman Engineering

Future-Proof Network For Heinen & Hopman Engineering

Pages 2 Pages

www.datwyler.com © 2009-2011 Datwyler. All rights reserved. 1 Heinen & Hopman Engineering B.V. – specialist in the design, development, production, and installation of air-conditioning systems for over 40 years – recently moved into an impres- sive modern office building in Haarbrug-Noord industrial zone. The company chose a Category 6A infrastructure for the communications network in its new headquarters. The high-end cabling and system components of the passive network were supplied by Datwlyer's Dutch partner RedLink B.V., based in Bunschoten-Spakenburg. The modern infra- structure solution was installed by Van den Hoogen Enginee- ring, a specialist for data network solutions also located in Bunschoten-Spakenburg. "At the new head office Heinen & Hopman wanted a sta

Join for free to read