Case Study

Full control and full automation

Full control and full automation

Pages 3 Pages

GRUNDFOS CASE STORY Full control and full automation TOPIC: The most modern hard coal fuelled power station in Poland relies on the Grundfos CIU 150 – the perfect communication interface for Profibus LOCATION: Poland COMPANY: BOT Elektrownia Opole S.A. power plant BOT ELEKTROWNIA OPOLE S.A. POWER PLANT IS LOCATED 9 KILOMETRES NORTH FROM THE CITY OF OPOLE, DOWNSTREAM OF THE MALA PANEW RIVER WHICH FLOWS INTO THE ODRA RIVER. THE EXISTING AND PLANN

Join for free to read