Case Study
Fuel Barge Drydock, Inspection, And Repair
CASE STUDY July, 2014 Greenstone II U.S. Department of the Interior (Subcontracted by Schwartz Boiler Shop) 1 FUEL BARGE DRYDOCK, INSPECTION, AND REPAIR 11739 M68/33 ONAWAY, MI MORANIRON.COM 989.733.201111739 M68/33 ONAWAY, MI MORANIRON.COM 989.733.2011 2 The GREENSTONE II, a U.S. Department of Interior fuel barge, was hauled out at the Port Calcite facility in late May 2014 with MIW’s 440-ton Manitowoc 16000 crane. Schwartz Boiler of