Case Study

FSO Cidade de Macae MV15 External Turret

FSO Cidade de Macae MV15 External Turret

Pages 2 Pages

Scope of Work SOFEC designed, constructed and supplied an external turret mooring system to moor a 350,000 dwt MODEC converted FSO vessel to receive, store and offl oad oil produced by the PRA-1 Platform and nearby oil ? elds in the Campos Basin, Brazil. General Description Client Name: Petroleo Brasileiro S.A.(Petrobras) Contract Award: December 2005 Installation Date: April 2007 First Oil: November 2007 Vessel Size: 350,000 dwt (appro

Join for free to read