Case Study

FRP Retrofit Of Concrete Floor System

FRP Retrofit Of Concrete Floor System

Pages 1 Pages

FRP RETROFIT OF CONCRETE FLOOR SYSTEM Name: Plaza Diego Type: Office Building Location: San Juan, Puerto Rico Project Overview Completed: March 2005 PROBLEM Formally the “Professional Building”, the Plaza de Diego received a makeover thanks to a $24.5 million construction budget. As part of this revitalization project, a new penthouse floor was added to the 12 th floor. The addition of a new floor on top of the 12 th floor

Join for free to read