Case Study
FracBlock Gel System Initiated Gas Production and Reduced Water Production in Barnett Well
Benefits ? Increased gas production from 0 to 250 MCFD ? Reduced water production by approximately 72%, from 360 to 100 BWPD ? Increased gas production and reduced water production on two offset wells ? Reduced HS&E risks by minimizing equipment needed for the operation ? Placed well back in production three days after treatment Background and challenges ? Produced only water at 360 BWPD and no hydrocarbons ? Adjacent wells pro