Case Study
FPSO OKHA
Loca O on of Project : Re-fit in Singapore Tyco Fire & Integrated Solu O ons Client : Op lan End User : Woodside Energy Scope of Work Project management, detailed design (electrical and so ware), system manufacture, tes ng and commissioning. Scope of Supply An ACE 100 PAGA system consis ng of 1 x PAGA ‘A’ & ‘B’ Central Equip- ment Systems Each system containing the following: • 1 x ACE 100 Node and associated hubs • 2 x AMPIID frames with each system fi ed with 12 x 300 wa AMPIID ‘On-line’ amplifiers and 1 x ‘Hot- Standby’ providing a total audio output of 7,200 Wa s. • CCU Telephone Interface & Digital; Storage Playback Unit • 2 x AMPIID Fan Assemblies Associated Field Equipment: 4 x ACET 18/NK Microphone Access Units 3 x ACET 01 Outdoor Intrinsically S