Case Study

FPSO Nan Hai Sheng Li Internal Permanent Turret

FPSO Nan Hai Sheng Li Internal Permanent Turret

Pages 2 Pages

Scope of Work SOFEC designed, constructed, and installed an internal permanent turret mooring system for the MODEC converted 140,000 dwt Nan Hai Sheng Li FPSO. The permanent turret mooring system installed in the FPSO enables the tanker to remain on station during 100-year ty phoon conditions characterized by wave heights up to 13.2m, currents more than 3 knots, and 87 knot winds. The Liuhua 11-1 ? eld is located in Typhoon Alley off sho

Join for free to read