Case Study

FPSO Cidade Rio de Janerio MV14 Spread Mooring

FPSO Cidade Rio de Janerio MV14 Spread Mooring

Pages 1 Pages

Scope of Work SOFEC designed and supplied the spread mooring system for a MODEC-owned 264,148 dwt FPSO located in the 1-RJS-409 / 3-RJS-415 Espadarte Sul ? eld off shore Brazil's Campos. The SOFEC spread mooring system ABS certi? ed. General Description Client Name: Petroleo Brasileiro S.A. (Petrobras) Contract Award: July 2005 Installation: December 2006 First Oil: January 2007 Vessel Size: 264,148 dwt Storage Capacity : 1,600,000 bbls Wa

Join for free to read