Case Study
FPSO Cidade de Sao Paulo MV23 Spread Mooring
Scope of Work SOFEC is responsible for the design and procurement of a spread mooring system for the FPSO Cidade de São Paulo – MV23 which will be deployed in the Guará ? eld in Santos Basin. The FPSO will be capable of processing 120,000 barrels of oil per day or 150,000 barrels of total ? uids per day, 180 MMscf/d of gas, with a CO 2 content up to 30% and have a storage capacity of 1,600,000 barrels. The FPSO will also be able to inject 1