Case Study
Foxborough Stadium Complex
Foxborough Stadium Complex H 2 S Odor Control/FOG Reduction Program Program Description A membrane bioreactor (MBR) waste water plant (biological anoxic-aerobic process) is operated NSU under contract, at Gillette Stadium complex. A gravity collection system brings all wastewater to several low points on the properties where pump stations transfer sewage to the treatment plant, which is located behind the stadium in a separate utility buildi