Case Study
Four Walls Maintenance Manufacturing Maintenance Project
A major manufacturer of diesel engines was experiencing difficulties with finished production testing or engine test cells, which are used to test the functional acceptance of new engines prior to shipment. These test cells were contributing to a high rate of failures as measured by data collected for First Test Acceptance (FTA). Over time, the manufacturer struggled to get the FTA up to 84%, meaning more than 16% of all engines failed o