Case Study

Foundation Settlement No Match for Ram Jack Driven Piles

Foundation Settlement No Match for Ram Jack Driven Piles

Pages 2 Pages

WA201802 ® CASE STUDIES RAM JACK WEST www.ramjackwest.com | 866-472-6522 Seattle, Washington RESIDENTIAL 21 DEEP-DRIVEN STEEL PILES INSTALLED NO MATCH FOUNDATION SETTLEMENT FOR RAM JACK DRIVEN PILESIn the beautiful town of Port Orchard, Washington, just 13 miles west of Seattle, a homeowner was experiencing cracks in the sheetrock and foundation walls. Making a wise decision, the homeowner contacted Ram Jack West to see how they could save their home. PROBLEM The homeowner started noticing interior signs of foundation failure. As a result, the homeowner began noticing cracks in the sheetrock, and doors and windows were out of frame. They believed their home had only settled a half an inch, but upon a thorough evaluation and elevation profile, it was discovered that the home had act

Join for free to read