Case History Forum’s Model 5000 Pipe WranglersTM Catwalk Increases Operational Efficiencies and Addresses Rig Floor Heights and Lifting Requirements The Challenge A customer drilling in the Middle East needed to safely deliver tubulars to rig floors with substructure heights of 40+ feet. Because redundant, high-pressure blowout preventers (BOPs) were required in this region, operating rigs with taller rig floor heights were needed, which fatigued rig personnel after repeatedly walking from the pipe deck to the rig floor when running pipe. The taller rig floors also resulted in poor pipe presentation to the well center and increased tailing efforts. The client’s crew needed to access tubulars from a more favorable position, while reducing the amount of time walking