Case Study

Fortum – Ericsson

Fortum – Ericsson

Pages 4 Pages

Fortum – Ericsson Moving from heat waste to heat recovery CASE STUDYA win-win solution Ericsson needed more cooling production on their site since their IT load was going to increase quite rapidly and they had rela- tively old cooling equipment that couldn’t support the new incoming IT loads. The company was also looking for an economic and ecological solution for this problem. At the same time, Fortum wanted a sustain- able solution that c

Join for free to read