Case Study

Fort Monmouth Cable Plant Design and Installation

Fort Monmouth Cable Plant Design and Installation

Pages 1 Pages

Fort Monmouth Cable Plant Design and Installation Wireline | Fort Monmouth, NJ Scope of Work Department of the Army - designed and built a redundant telecommunications pathway between the telecom building on the main post and the Army's nearby Charles Wood facility. Designed to perform for decades without maintenance, the entire pathway is concrete encased for durability. Six underground ducts were installed along with 18,000 feet of 144 strand fiber cable. Since the cable route passes through various jurisdictions, MasTec had to obtain and coordinate a large number of digging permits and right-of-ways, including: the Army, town, county, NJ DOT , local telephone company, and railroad. Services Employed Design, Engineering, & Installation Fiber Optic OSP Right-of Way, Permits Testing Projec