Case Study

Former Drum reconditioning facility

Former Drum reconditioning facility

Pages 1 Pages

An Employee-Owned Company | © 2014 Kleinfelder. All rights reserved. From approximately 1972 to 1985, this 12.5-acre facility operated to recondition 55-gallon drums that contained various types of residual wastes. Waste from the operations at the site consisted of ash and slag from the incinerator processes. Residual and caustic wastes were generated from the rinse processes to clean the drums. In addition, the NJDEP historical documents

Join for free to read