Case Study

Formaldehyde In-Situ Bioremediation

Formaldehyde In-Situ Bioremediation

Pages 3 Pages

ISO 9001:2008 CERTIFIED Formaldehyde In-Situ Bioremediation In railroad ballast using Microcat ® -XR Hydrocarbon Degrader – BSE 042 Problem Accidental release of 50% formaldehyde solution from a rail car (20,000 gallons) on a siding had resulted in significant rail ballast (gravel) and site soil contamination. The main body of the spill was contained by an emergency spill cont

Join for free to read