Case Study
Forestry Commission, Smithton, Inverness
JJI-Joists were used extensively throughout the project as speci? ed by the architect whilst the detailed design was completed by the project engineer. The design remit was to use as much locally sourced material as possible, to produce a building which had both environmentally sound credentials and was of sustainable construction. The length of the building leant itself to the use of 12 metre JJI-Joists in the ground ? oor and roof c