Case Study
Ford of Europe save with ENER-G’s Building Energy Management System
Case study | Ford Solution Based on a detailed site survey a two- phase project implementation strategy was planned. The first project phase included the design, maintenance and finance of a BEMS to take control of the heating plant and reduce Ford’s annual heating spend by 10%. This prudent projection was made based on difficulties often experienced with providing savings on oil fired sites. The second phase of the project was to re