Case Study

Flygt SmartRun keeps control of the costs

Flygt SmartRun keeps control of the costs

Pages 2 Pages

Case study Wastewater transport • Pump station Flygt SmartRun ™ keeps control of the costs Built in 2006, the Sigtuna pump station has two Flygt N 3153 HT pumps, originally started via soft starters. Long-term testing has indicated that the station has an inflow of approximately 65000m 3 /year. There are generally two types of controls for wastewater pumping sys- tems. Conventional on/off controls, which are simple to use but give limited

Join for free to read