Case Study
Florida Project
The project had been trying to control the discharge of turbid water by treating the lakes on a monthly basis, with poor results. It was decided to install a continuous flow-through treatment system to treat the turbid water before discharge off site. A split pipe treatment system was designed to clarify the water before discharging into state waters. Samples of the turbid water on the site were sent to the APS lab for testing, fre