Situation: A manufacturer of investment-casted aircraft and turbine parts was operating on a high-volume capacity of three shifts a day, seven days a week. When the concrete ramp leading to a supply warehouse began to break down and re-bar became exposed, maintenance engineers were concerned. Not only was this a hazard to personnel, but fork truck operators who brought in loads of high-quality metal alloy ingots actually lost loads due to the det