Case Study
Floating Cover M.I.C. - Tulalip Fish Hatchery
Floating Cover M.I.C. - Tulalip Fish Hatchery LOCATION: Tulalip, Washington TIMEFRAME: December 2006 SCOPE OF WORK: Design and install insulated cover for fish hatchery to ensure maintained water temperatures and minimize debris infiltration PROJECT PARTNERS: Owner: Tulalip Fish Hatchery Customer required a method to cover and maintain water temperature and minimize debris in ltration to a sh hatchery rearing pond in NW Washington State. Water supply to the pond was provided from well water that required control of algae growth during the warmer spring and summer months.Lay eld designed and installed a modular insulated cover (MIC) that consisted of 2” foam insulation encapsulated in fabricated polyethylene panels. The panels were installed on two ponds with irregular dimensions separated