Flexwell for hot water

Flexwell for hot water

Location Zurich Airport Product FLEXWELL Supply and install, including connectors Flexwell for hot water 2010 Case StudyAirport Zurich 2010 Case Study Solution: Flexwell could be used here thanks to its good insulation value and easy installation. As shown in the picture above, the pipes were laid directly in the trenches from the reels. This meant that several hundred meters of pipe could be laid in one section. Task: A mix of hot water and glycol is used to de-ice aircraft on the runways in winter. The client wanted a pipe that would not only keep the water hot and safe as it is transported over long distances, but that would also be easy to lay. Brugg Rohrsystem AG Industriestrasse 39 CH-5314 Kleindöttingen phone +41 (0)56 268 78 78 fax +41 (0)56 268 78 79 pipesystems@bru