Case Study

Flexiglide Shutters Installation at the O2 Arena

Flexiglide Shutters Installation at the O2 Arena

Flexiglide Shutters Installation at the O2 Arena Completed June 20162 0 5 0 A N G U S R O A D , S A L V I S A , K E N T U C K Y 2 1 2 - 4 4 2 - 5 5 0 5 | @ C U P P A C A F E This was a challenging project as the ceiling height was over 4 meters with a multitude of structures such as HVAC and lighting in the way of the support for the 15m and 20m curved Shutters The Flexiglide shutters were specified to close off 3 isolated island bars for the main 02 event holding area. The Flexiglide solution were perfect for the job as they are horizontally driven, lightweight and are able to accommodate curves, meaning that the shutters enclosed the island bars. fully whilst also offering security and, easy operation. Tel: 01392 270218 Email: info@hvpshutters.co.uk Web