Flexible, Lean Execution Keeps Time-Sensitive Project Under Control

Flexible, Lean Execution Keeps Time-Sensitive Project Under Control

Schneider Electric assists an oil refinery customer with a rehabilitation and adaptation project. TBD 995-1284-12-21-15ARO Flexible, Lean EXecution keeps time-sensitive project under control The customer was drawn to the idea of Engineering Workbench in relation to their SmartPlant Instrumentation database. Schneider Electric was chosen as the vendor for all the emergency shutdown, fire and gas, and distributed control s