Case Study
flex7 Lighting connection and control products have been used in the recent £9.5m redevelopment of The Moy’s End Stand at Peterborough United football
flex7 Lighting connection and control products have been used in the recent £9.5m redevelopment of The Moy’s End Stand at Peterborough United football
Peterborough Football Club Leisure flex7 Lighting connection and control products have been used in the recent £9.5m redevelopment of The Moy’s End Stand at Peterborough United football stadium. The project includes a 3000sqm specialist education centre, linked to the stand. The building was designed to reach a BREEAM excellent standard.Absence control flex7 absence and daylight linking lighting control was installed throughout the building.