Fletcher Allen Healthcare Burlington, VT - Arc Flash Analysis

Fletcher Allen Healthcare Burlington, VT - Arc Flash Analysis

Pages 1 Pages

Hallam-ICS - Health - 4 Hallam-ICS was tasked by the Manager of Facilities Operations to begin the process of getting the hospital compliant with OSHA and NFPA 70E requirements for arc flash labeling of their electrical distribution systems. Phase 1 consisted of Hallam-ICS beginning at the top end of the hospitals dual utility power feeds down to the various substations that support the multitude of buildings including the (3) multi megawatt eme