Case Study

Fishtek Consulting

Fishtek Consulting

Background In December 2014 Hydro-Logic Services was ap- pointed by Fishtek Consulting to undertake flood risk assessments for the installation of fish passes at Brightside and Steelbank weirs in the River Don, Sheffield. The design and installation of the fish passes had been undertaken by Fishtek Consulting on behalf of the Don Catchment Rivers Trust. In order to support the assessment of flood risk re- sulting from the proposed install

Join for free to read