Case Study

Fishers IN

Fishers IN

Pages 1 Pages

# The Cedar Cove lift station in Fishers, IN was constructed in the early 1990’s. It is outfitted with two submersible 230 volt three phase pumps and the design capacity is 180 gpm at 96 feet total dynamic head (TDH). By 2011, the lift station was in major need of renovation. The pumps were clogging so frequently that a third pump was purchased to rotate into production slots to facilitate repairs while maintaining lift station capacity.