Case Study

First Successful Deployment of Integrated Sand Control Packer and Fiber-Optic Wet Connector System

First Successful Deployment of Integrated Sand Control Packer and Fiber-Optic Wet Connector System

Pages 2 Pages

Results n n Deployed the industry’s first integrated sand control packer and fiber-optic wet connector system in a dry-tree application n n Delivered continuous and real-time monitoring across the sand face in a two-trip completion, enabling the operator to enhance production Background and challenges n n Dry-tree completion in 3,000 ft of water n n Operator needed to monitor downhole conditions and production data across the sand fa

Join for free to read