First SET Openhole Liner in Kazakhstan Enables Well Deepening

First SET Openhole Liner in Kazakhstan Enables Well Deepening

Pages 1 Pages

Enventure Global Technology 15995 North Barkers Landing, Suite 350 | Houston, Texas 77079 Tel 281.552.2200 | Fax 281.552.2201 | www.EnventureGT.com ©2015 Enventure Global Technology Enventure and SET are trademarks of Enventure Global Technology All Rights Reserved. Ver01 03/15 PERFORMANCE First SET ® Openhole Liner in Kazakhstan Enables Well Deepening Challenge An Operator planned to maximize production in a 30+-year- old well by directionally deepening the well to intersect an undeveloped reservoir. The well was originally drilled vertically to 14,599 ft (4,450 m) with 7 in. casing set at 12,926 ft (3,940 m). The well deepening objective was to directionally drill from a kick-off point in the open hole at 14,927 ft (4,550 m), through the target reservoir, TD at 17,