First Man Up Cable Replacement

First Man Up Cable Replacement

Pages 1 Pages

CASE STUDY 8: FMU Cable Replacement BEFORE AFTER CASE STUDY: Height Safety Industry Leader for Technical Maintenance, Inspections, and Safety Services at Height. Call RIGCOM Access on 1300 893 230 or email: admin@rigcomaccess.com Brief: RIGCOM Access was commissioned to complete an assessment of the safety systems on a school building and recommend any improvements required. Assessment: Following a review of the site, it was noted there were issues with all the existing First-Man-Up cables installed: • The First-Man-Up (FMU) cables weren’t directly attached to an anchor point; • Some cables had corroded completed through; • The protective sheath had degraded in the sun and simply cracked when being picked up; • The end connecting eyes were significantly corroded. Solution: The RIGCOM Acc